Nainawa 6X125 MW 9E Gas Turbine Power Plant
in 2018 Snmec company was working in Nainwa Gas power plant as a contractor under Ge company to rehabilitation the power plant because was damaged by ISIS. we working as testing & commissioning company under Snmec to test 6.6kv MV switchgear, circuit breaker, auxiliary transformer 6.6/0.4kv.
400KV AIS Substation Rumaila IPP Stage-1(1500MW)
in 2018 we get contract works on the Rumaila power plant 1500MW as testing and commissioning company under Shamaragroupp company to test control & protection panels, circuit breakers, current transformers, voltage transformers, disconnectors, 110VDC system, 220VAC ups system.
South Baghdad 2 Power Plant
in 2017 Shamara group was working in south Baghdad 2 power plant under Ge company to install new turbines frame 5 instead old frame 5 types we working under Shamara group as testing and commissioning company to test (MV switchgear, generator protection, MV cable, power transformer).
Al-Hilla Gas Turbines Power Project
in 2016 IFC company was working in Hilla power plant project 2x125MW as EPC company faced two problems 1- soft signals like current, voltage, power and digitals signals between MV switchgear 6.6kv, LV switchgear 0.4kv was not transferred to the DCS system (distribution control system) in the main control room after check founded MODBUS RTU […]
Al-Ammara Gas Turbines Power Project
in 2016 MOE call us to meet STX company on site to support them during energizing units then synchronizing units with grid 400kv system. they faced problem during synchronizing unit gird get trip unit by differential protection of step-up transformer after an inspection found setting relay parameters (wrong), polarity current transformer need modifying in the […]