in 2018 Snmec company was working in Nainwa Gas power plant as a contractor under Ge company to rehabilitation the power plant because was damaged by ISIS. we working as testing & [...]
in 2018 we get contract works on the Rumaila power plant 1500MW as testing and commissioning company under Shamaragroupp company to test control & protection panels, circuit breakers, current [...]
in 2017 Shamara group was working in south Baghdad 2 power plant under Ge company to install new turbines frame 5 instead old frame 5 types we working under Shamara group as testing and [...]
in 2017 CMS company was working in AL Musab thermal power plant as maintenance company ask us to support them in testing and commissioning generator protection relays.
in 2017 IFC company was working in Karbala site as EPC company during warranty period generator protection relay defected (not working properly) after check we replaced by new relay type G60 then [...]
in 2016 IFC company was working in Hilla power plant project 2x125MW as EPC company faced two problems 1- soft signals like current, voltage, power and digitals signals between MV switchgear [...]
in 2016 MOE call us to meet STX company on site to support them during energizing units then synchronizing units with grid 400kv system. they faced problem during synchronizing unit gird get [...]